In October 2020 DJN Limited completed this installation of a mezzanine floor and access stair for our clients Hall Construction Services Limited in Durham.

With the help of MRSD Detailing Ltd we were able to design a space that utilised the factories existing steel frame to create a mezzanine floor which now has over 80m2 of storage space.

The structure compromised of a steel frame, purlins, kee klamp handrail 38mm OSB flooring and galvanised access stair. All manufacture and installed by the team at DJN Limited.

If you have a space in your factory or building which you want to utilise, please get in touch and we can take a look at it for you.

Services